kraken_официальный_сайт

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
kraken_официальный_сайт [2026/07/11 20:02]
216.73.216.62 old revision restored (2026/07/11 14:57)
kraken_официальный_сайт [2026/07/12 07:24] (current)
216.73.216.62 old revision restored (2026/07/12 01:42)
Line 1: Line 1:
 ====== kraken официальный сайт ====== ====== kraken официальный сайт ======
-February: Intuitive Machines returns for second round [[https://kra26s.cc/|kraken darknet onion]]+Los Angeles Times slashes more than 20% of newsroom staff as the paper confronts ‘financial crisis’ [[https://kraken8.it/|kraken зеркало]]
  
-Houston-based Intuitive Machines made history in February 2024 by putting a US-made lunar lander on the moon for the first time in more than five decades.+The Los Angeles Times on Tuesday, facing what senior leadership described this week as a “financial crisis,” commenced a round of painful layoffs across the newsroom, a workforce reduction that is set to be one of the most severe in the newspaper’s 142-year history.
  
-The triumphant touchdown of the company’s Nova-C lunar landercalled Odysseus, spurred jubilant cheers during the company’s webcastBut the landing wasn’t perfect: Odysseus tipped over on its side because of a navigation issueleaving the vehicle to run with limited power and capabilities.+The cuts will impact at least 115 journalists, a person familiar with the matter told CNNor slightly more than 20% of the newsroomSome 94 of those cuts will be among unionized employeesunion chief Matt Pearce said, meaning a quarter of the union will be laid off.
  
-But Intuitive Machines will soon get another shot at perfection with new Nova-C landercalled Athena, set to make its way moonward this year.+Pearce described the total number of employees being laid off as “devastating” figurebut said it was “nonetheless far lower than the total number” expected last week.
  
-The mission, slated to launch on a SpaceX Falcon 9 rocket, could kick off as soon as late February, the company confirmed Monday. It will aim to land near the moon’s south pole — a region considered crucial to the current moon race because it’s believed to be home to stores of water ice.+Among those laid off Tuesday was Kimbriell Kelly, the newspaper’s Washington bureau chief, along with significant cuts to its business and sports desks.
  
-Water found there could be used to provide astronauts with drinking water or even converted to rocket fuel.+“The LA Times Washington bureau was decimated,” Sarah Wire, a Washington-based reporter for the Times wrote on X. 
 + 
 +“They haven’t been filling jobs for two years now and that reduced number was cut even more today. There are five reporters left covering DC.
  
kraken_официальный_сайт.1783771322.txt.gz · Last modified: 2026/07/11 20:02 by 216.73.216.62